Hawthorn Construction
Finished kitchen with sage green shaker cabinets, brass hardware, and quartz counters

Kitchen Renovations in Mississauga

Cabinets are the easy part. The layout, the light, and the details are what you live with.

Mississauga homes

What kitchen renovations usually means in Mississauga

Mississauga is mostly post-war and later: sixties and seventies backsplits and sidesplits through Cooksville and Applewood, eighties and nineties two storeys across Erin Mills and Meadowvale, and older lakeside homes around Port Credit and Lorne Park. The splits in particular have low basement ceilings and ducts in awkward places, which is a framing problem before it is a design problem.

Lots south of the QEW near the lake often have older services and clay soil that moves, so we look hard at drainage before finishing anything below grade.

A kitchen renovation touches nearly every trade in the house. Plumbing, electrical, gas, flooring, drywall, tile, and cabinetry all have to land in the right order, and a delay in one pushes everything behind it.

What is included

Everything this job actually involves

Layout and design input

We work through the plan with you before demolition, including where the light, the outlets, and the traffic actually go.

Cabinetry and installation

Supply and install, or install cabinetry you have already chosen. Levelled, scribed, and shimmed so the doors line up years from now.

Countertops and backsplash

Quartz, tile, and the templating and coordination that goes with them.

Plumbing and electrical

Sink and appliance connections, new circuits, under-cabinet and pot lighting, all by licensed trades.

Flooring and trim

Subfloor correction, vinyl plank or hardwood, baseboard, casing, and the transitions between rooms.

Custom woodwork

Live-edge sills and shelves, floating shelving, range hood surrounds, and open shelving milled in our shop.

Full kitchen renovations details →

Our work

A century home kitchen in Guelph

We took this kitchen back to the studs. Behind the lath we found newspaper from the 1920s still stuffed in the walls, along with the wiring and plumbing you would expect in a house that age.

What went back in was a full rebuild: new subfloor, insulation, wiring, a vaulted ceiling with a skylight, sage shaker cabinets with brass pulls, quartz counters, and a live-edge sill under the window over the sink.

Live-edge wood window sill set against a quartz counter above a kitchen sink
The sill was milled in our shop to fit the opening
Quartz counter, grey subway backsplash, and brass cabinet hardware
Quartz, subway tile, and brass

How it goes

From first visit to final walkthrough in Mississauga

  1. 01

    We come and look

    Cameron walks the space with you, listens to what you actually want, and tells you honestly what is and is not worth doing.

  2. 02

    A quote you can read

    Written scope, line by line, so you know what is included before anything is torn out. No vague allowances hiding surprises.

  3. 03

    We build it

    The same crew, start to finish. You get updates as things move, and you always know who is in your house on any given day.

  4. 04

    Walk it together

    We go through the finished work with you and fix anything on the list. Then we clean up properly and get out of your way.

Mississauga questions

Straight answers, before you ask

Do you need a permit for kitchen renovations in Mississauga?

Permits are issued by the City of Mississauga, and whether you need one depends on the scope. Structural changes, new plumbing, and new circuits almost always require one. We confirm the requirement for your address and handle the application and inspections as part of the job.

How far into Mississauga do you travel?

All of it, including Port Credit, Lorne Park, Streetsville, Clarkson. Mississauga is inside our normal working area, so you are not paying for a special trip.

How long is a kitchen renovation?

A typical full kitchen runs six to ten weeks from demolition to finished trim, with cabinetry and countertop lead times driving most of the schedule. We order long-lead items before we start tearing out.

Can I stay in the house during the renovation?

Most people do. We set up dust protection and keep the work zone contained, but plan on a temporary kitchen somewhere else in the house for several weeks.

Do you supply the cabinets or do I?

Either works. We can supply and install, or install cabinetry you have already selected. If you are supplying, we will review the plan before you order so nothing arrives that does not fit.

Do I need a permit for a kitchen renovation?

If you are only replacing cabinets and finishes, usually not. Moving plumbing, adding circuits, or removing a wall generally does require one, and we handle that.

Start the conversation

Tell us what your home should become.

Send photos of the space with your message. A few pictures tell us more than a paragraph ever will, and they make the first estimate far more accurate.

647-560-6115

Answered day and night

Drag them in, or tap to choose. Up to 8 images or PDFs, 10MB each.