Hawthorn Construction
Finished cedar deck with mitred border boards along the back of a house

Decks & Outdoor in Muskoka

Built on real footings, with the frame square, so it still feels solid ten winters from now.

Muskoka homes

What decks & outdoor usually means in Muskoka

Muskoka is cottage and waterfront property, where the build often matters more than the renovation: bunkies, boathouse-adjacent structures, decks that follow rock, and cottages being made comfortable year round.

Shoreline work brings the district and the conservation authority into the process, and rock changes what footings cost. We have built a bunkie in Bracebridge and we are set up for the drive and the site conditions.

Almost every failed deck we get called to look at failed underneath. Footings too shallow for our frost depth, a ledger fastened wrong, or a frame that was never square, and no amount of good decking on top fixes any of it.

What is included

Everything this job actually involves

Footings and structure

Excavation, sonotubes, and poured footings below frost line, plus a properly flashed ledger where the deck meets the house.

Cedar and composite decking

Cedar, pressure treated, and composite, installed with hidden fasteners where the product allows.

Railings and stairs

Wood, cable, and glass railings, and stairs built to code so the rise is consistent underfoot.

Pergolas and covered structures

Shade structures and covered sections, tied into the deck framing or standing on their own posts.

Screened porches

Enclosed outdoor rooms with screen systems, framing, and roofing so you get the evening back from the bugs.

Fences and gates

Privacy fencing and gates set on posts that will not lean by the second season.

Full decks & outdoor details →

Our work

A cedar deck in Mississauga

This one started with a shovel. We dug and poured the footings, set the beams, and framed the platform level with the walkout before a single deck board went down.

The cedar went on with mitred borders and a picture frame edge, which is slower to lay out but it is the detail that makes a deck look built rather than assembled.

Deck joist framing squared and levelled before decking is installed
The part nobody sees, and the part that matters
Finished cedar deck with mitred border boards
Cedar with a mitred picture frame border

How it goes

From first visit to final walkthrough in Muskoka

  1. 01

    We come and look

    Cameron walks the space with you, listens to what you actually want, and tells you honestly what is and is not worth doing.

  2. 02

    A quote you can read

    Written scope, line by line, so you know what is included before anything is torn out. No vague allowances hiding surprises.

  3. 03

    We build it

    The same crew, start to finish. You get updates as things move, and you always know who is in your house on any given day.

  4. 04

    Walk it together

    We go through the finished work with you and fix anything on the list. Then we clean up properly and get out of your way.

Muskoka questions

Straight answers, before you ask

Do you need a permit for decks & outdoor in Muskoka?

Permits are issued by your local Muskoka municipality, and whether you need one depends on the scope. Structural changes, new plumbing, and new circuits almost always require one. We confirm the requirement for your address and handle the application and inspections as part of the job.

How far into Muskoka do you travel?

All of it, including Bracebridge, Gravenhurst, Huntsville, Port Carling. Muskoka is inside our normal working area, so you are not paying for a special trip.

Do I need a permit to build a deck in Ontario?

Generally yes if the deck is more than about 60 cm above grade or attached to the house, though the threshold varies by municipality. We confirm the requirement for your address and handle the permit.

Cedar or composite?

Cedar looks and feels better and costs less upfront, but wants cleaning and re-oiling every couple of years. Composite costs more and gives you most of that time back. We build both and will give you a straight answer for your situation.

How deep do the footings need to be?

Below the local frost line, which in our service area generally means around four feet. Footings that stop short of it are the most common reason older decks heave.

How long does a deck take to build?

Most decks take one to three weeks depending on size and railing type, plus the time for footing inspection where the municipality requires it.

Start the conversation

Tell us what your home should become.

Send photos of the space with your message. A few pictures tell us more than a paragraph ever will, and they make the first estimate far more accurate.

647-560-6115

Answered day and night

Drag them in, or tap to choose. Up to 8 images or PDFs, 10MB each.